DHS Systems S series Specifikace Strana 12

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 30
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 11
Operation & Maintenance
Part Number 1006370 DHS SYSTEMS LLC
This document contains information proprietary to DHS SYSTEMS, LLC and is intended solely for use by its customers. No portion of this document may
be reproduced for release to a third party without written consent from DHS SYSTEMS LLC
.
3. Check that the wind lines are not snagged on any hubs. Snagged wind lines may prevent the shelter from spreading.
4. To spread the shelter, place one person at each corner of the shelter. On larger shelters, it may be necessary to
position one person in the center of each side wall; this will help distribute the load.
2.1.3 Position, Lift, & Spread the Shelter
Before any commands or movement of the shelter takes place, the team leader must be certain that all
team members are in position to ensure movement is coordinated and synchronized. Damages to the
shelter will incur.
NOT E
1. With both hands, grasp the lifting hubs. The hubs will spread
out as the shelter is opened.
2. With a minimum of (4) people, (depending on model) and on
the team leaders command, lift the shelter off the ground,
take two steps backwards and put the shelter down. If
anyone feels any resistance, immediately yell
STOP
; identify
and correct the problem before continuing.
Figure 2-2. Lifting & Spreading the Shelter
3. Continue to lift the shelter at the highest point of the strut, step backwards, and spread the shelter. Repeat this
process until the shelter reaches its maximum spread.
4. At maximum spread, the shelter will resist any further expansion.
2.1.4 Raise Shelter to Pole Height
Never push on a hub that does not have a red flag
NOTE
1. Locate the push poles that were removed from the transport bag.
2. Locate the red flag hubs under the frame as shown in Figure 2-3.
3. Position people at the doorways. Place and hold the push pole at the push point hub (red flag). All people should be
ready to push up. At this time, the team leader should get a verbal signal from each member that they’re ready.
4. Each person should simultaneously lift the shelter up. As quickly as possible, place one end of the push pole directly
underneath the push point hub with the red flag, keeping the push pole straight see Figure 2-4.
5. On the team leaders command, team members lower the shelter down so it is resting on all four push poles.
Zobrazit stránku 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 29 30

Komentáře k této Příručce

Žádné komentáře